

Today the glass floor was finished and grouted. Note the full tiles down the left side wall (the large grout joint will be covered by baseboard). This is the result of Josh taking the time to widen the rows as he installed the tiles (see yesterday's blog).
The picture below is the finished product (all grouted) of the octagon mesh mount sheets.
Another job well done!
